Week 11 - Building Fabric

The building

Week 10 - Program

Old Program:

The program of the building for the interim crit was a cop out, and didn't have the substance required to truly activate the Howard Smith Wharves Site.

New Program:

The building will house a state of the art photometric laboratory, too which the current QUT photometric lab staff will migrate. The building will also serve a duel purpose as a function space with bar and kitchen attached.

GROUND FLOOR

LEVEL 1


Monday, 7 May 2012

Week 9 - Folie to Building Presentation Panels

PANEL 1 - LOCATION

PANEL 2 - FORM GENERATION

PANEL 3 - FORM GENERATION

PANEL 4 - FORM GENERATION

PANEL 5 - DESIGN PROPOSAL

PANEL 6 - NATURAL LIGHTING PROPOSAL

PANEL 7 - PROPOSAL PLAN & SECTION

PANEL 8 - CIRCULATION

PANEL 9 - INITIAL PROGRAM LAYOUT









Week 9 - Folie to Building Crit

Folie to Building

Week 8 - Design Development

Folie